How to Track Solar Installs From Survey to Switch-On in 2027

A solar job has many steps. One board that shows them all stops jobs getting stuck.

Nov 12, 2026 / 3 min read / Custom software

A customer signed her solar contract in March, full of excitement. It is now June. There are no panels on her roof.

She calls the office. The person who answers does not know where her job is. 'I think we are waiting on the permit? Let me find out and call you back.' Nobody calls back.

The permit was approved five weeks ago. It has been sitting in an inbox. She writes a one-star review that evening, and it is fair. The install itself, when it finally happens, is perfect. It does not matter any more.

A solar job is not one job. It is a chain: survey, design, contract, permit, utility approval, install, inspection, switch-on. It can stall at any link, and often nobody notices.

Customers do not get angry about delays as much as about silence. One simple board solves both problems.

One card per job, one column per step

Picture a wall with a column for each stage. Every job is a card that moves from left to right.

  • 01Survey done.
  • 02Design approved.
  • 03Contract signed.
  • 04Permit submitted.
  • 05Permit approved.
  • 06Install scheduled.
  • 07Installed.
  • 08Inspection passed.
  • 09Switched on.

Anyone can see in seconds where every job is.

Make stuck jobs stand out

The real value is spotting what is not moving. A card that has sat in one column too long should change colour.

A job in 'Permit approved' for five weeks would have been bright red on that board. Somebody would have seen it.

A project board with cards in columns

Related: Solar Follow-Up: Staying in Touch Through a Long Sale in 2027

Update the customer at every step

Each time a card moves, the customer should get a short message.

Words you can use

Good news, your permit has been approved! We are now scheduling your install and will be in touch with dates this week.

This single habit removes most 'what is happening?' calls, and most bad reviews.

Give crews what they need

The card should hold the address, the system design, photos from the survey and any notes about access. The crew should never have to ring the office for basic details.

Related: How to Get ChatGPT to Recommend Your Solar Company in 2027

Know your own timings

Once jobs are tracked, you can see how long each stage usually takes. Then you can give customers honest timelines up front.

Common questions

What is the best way to track solar installs?
A simple board with a column for each stage and a card for each job, where stalled jobs are flagged automatically and customers are updated when a job moves.
How do I stop customers calling for updates?
Tell them before they have to ask. A short message at every stage, plus an honest timeline at the start, removes most of those calls.

That customer's install was flawless. Her review was one star. The work was never the problem. The silence was, and a permit sitting unnoticed for five weeks.

Track every solar install from survey to switch-on on one board. Nothing sits forgotten, every customer knows what is happening, and the excitement they felt on signing day lasts until the day the system goes live.

We do this for local businesses every week. If it would help, we can show you a demo made for your solar company.